The project provides for the laying of cast-iron pipes of the VChShG with a diameter of 300 cm and a total length of 2300 meters. ⠀
The new water supply will provide not only the needs of the residential complex, but also other nearby houses.
35% of all works have already been completed with landscaping, namely 800m² of paving slabs have been laid, 1000m² have been asphalted, 500 curbstones and 500 concrete curbs have been installed. ⠀
Currently, compaction work is underway, and the installation of road sides and curbs is ongoing, and soil planning is ongoing.