Designing

Designing

– pre-project work, collection of initial data, preparation of the design task, technical and economic feasibility study (FEA), technical and economic calculation (TER)

01

– engineering research works

02

– development of the general plan

03

– passing state expertise, support and protection of project documentation at all levels

04

– architectural solution – architectural and construction drawings:

*floor plans – placement of individual rooms and their dimensions, area, placement of walls, door and window openings, kitchen and sanitary facilities, equipment
* plan and specification of elements of the rafter structure of the roof
*roof plan
*sections of the house
*house facades

05

– design of internal and external networks and systems of water supply and sewage, heat supply, electricity supply, gas supply, ventilation and air conditioning:

*heating lines, individual and central heating points (ITP, CTP)
* water supply, drainage, storm and household sewage, sewage-pressure and non-pressure (gravity) stations, stations of increased and decreased pressure, reservoirs
*boiler, furnace

06

– design of local treatment facilities

07

– accounting documentation

08

– assistance in completing questionnaires and obtaining technical specifications for connecting a facility to gas, heat, water supply and sewerage sources from operating organizations

09

– design solution – layout diagrams of foundations, floors, stairs, rafter structures, detailed drawings of individual components, specifications of products and materials

10

– author’s supervision

11

– interior and landscape design

12