Designing
– pre-project work, collection of initial data, preparation of the design task, technical and economic feasibility study (FEA), technical and economic calculation (TER)
01
– engineering research works
02
– development of the general plan
03
– passing state expertise, support and protection of project documentation at all levels
04
– architectural solution – architectural and construction drawings:
*floor plans – placement of individual rooms and their dimensions, area, placement of walls, door and window openings, kitchen and sanitary facilities, equipment
* plan and specification of elements of the rafter structure of the roof
*roof plan
*sections of the house
*house facades
05
– design of internal and external networks and systems of water supply and sewage, heat supply, electricity supply, gas supply, ventilation and air conditioning:
*heating lines, individual and central heating points (ITP, CTP)
* water supply, drainage, storm and household sewage, sewage-pressure and non-pressure (gravity) stations, stations of increased and decreased pressure, reservoirs
*boiler, furnace
06
– design of local treatment facilities
07
– accounting documentation
08
– assistance in completing questionnaires and obtaining technical specifications for connecting a facility to gas, heat, water supply and sewerage sources from operating organizations
09
– design solution – layout diagrams of foundations, floors, stairs, rafter structures, detailed drawings of individual components, specifications of products and materials
10
– author’s supervision
11
– interior and landscape design
12
